Two surfaces on one 2,000 m² Sydney job show why grinder choice starts with the slab. See how we tackle high spots, warehouse preparation and site power.
By Filip Plesko, owner and commercial floor-preparation operator at Resin Me Epoxy.
On a 2,000 m² commercial fit-out in the Sydney CBD, roughly half the floor was covered in old carpet adhesive. The other half was dense polished concrete. From the doorway it was one job. Once we got onto the slab, it was two very different surfaces.
Some of the adhesive softened and smeared as we worked, loading the tooling. We adjusted the removal approach, dealt with the bulk adhesive first and followed with grinding passes to reduce the residue. Across the polished half, the job was to open the dense surface for the new flooring. The area on the plan told us the scale. What we found under the grinder told us how to tackle it. See the Sydney CBD project.

On an open warehouse floor, a large three-phase grinder makes sense when there’s room for consistent passes and the site can support the power and dust extraction. I look at the existing coating or adhesive, the condition of the slab and the surface profile the next trade needs. Those details guide the machine, tooling and sequence. Explore our commercial concrete grinding service.
The choice can change within a single job. On a 300 m² Parramatta showroom, we ran a three-phase planetary grinder across the open floor and used smaller equipment at accessible edges and around details. The tiling contractor was taking over after us, so the agreed preparation had to carry through to those areas as well. See the Parramatta showroom project.
Grinding takes concrete off raised areas. A smaller grinder can help us work on a local ridge, raised joint edge or tight transition without cutting a much wider area. A genuine depression may need a compatible repair or levelling material. I check the surrounding levels, the agreed tolerance and the next floor system before deciding what belongs in the scope.
A dip beside a doorway and a raised edge across a forklift route call for different decisions. On an elevated commercial slab, we used controlled grinding to reduce prominent ridges and checked the surface as the work progressed. Measurements and the agreed handover condition matter more than how even the slab looks from the doorway. See the elevated slab project.
Our fleet includes HTG-680RC and HTG-550RC remote-controlled grinders, a Husqvarna PG 6 DR remote-controlled grinder and an HTG 680 LPG/propane grinder. We also use smaller machines for detail work and our own site power, including Makinex 32 kVA and 16 kVA generators. Before mobilisation we check what supply is available and what the chosen grinders and dust extractors will need. On a warehouse job, we also plan how equipment, leads and hoses will move through the work zones. See our equipment and site power capability.
We’ve used our LPG grinder on selected warehouse jobs where ventilation was part of the equipment choice. We start with electric equipment where reasonably practicable. Any LPG option depends on a site-specific risk assessment, site rules and the manufacturer’s requirements for controlling exhaust. Fuel-powered equipment can produce carbon monoxide, including in semi-enclosed spaces. Read SafeWork NSW’s guidance on carbon monoxide.
At a 1,500 m² Campbelltown warehouse, the owner’s team was installing the epoxy. Our scope was mechanical preparation, accessible edge work and industrial vacuum cleaning. We handed the floor over for their team to assess against the selected coating system. Agreeing on the stopping point early made it clear what each team was responsible for. See the Campbelltown warehouse project.
If you’re planning a commercial floor of 200 m² or more in Greater Sydney, send me the suburb, approximate area, photos of the existing surface and details of the next finish. Let me know about access, timing and available power if you have them. We can use that information to scope the grinding, coating or adhesive removal and preparation-only handover. Request a commercial floor preparation quote.